Wednesday 4 March 2009

Filming schedule

I will be filming at Toton Sidings which is next to the train tracks but separated by a large metal fence. I will film on Saturday the 7th March 2009 and i will film it three times once at about two or three o'clock in the afternoon when it is fully light outside. I also film it at about five o'clock when it is beginning to get dark so it will be scary and yet the camera will be able to see. Finally I will film it at eleven o'clock at night so it is pitch black although the camera may not be able to see anything. I will then look back at all three of my foot ages and choose the best looking one for my ideas. I will then edit it to make it look as creepy and scary as possible for a thriller.